The first month is about observation and stabilization
New systems are operating together for the first time. Pool water and finishes are stabilizing, irrigation is being tuned, new landscape material is establishing and the property is responding to weather.
First 48 hours
- Follow the startup professional’s directions for the exact pool finish and water program.
- Confirm circulation and observe the equipment pad for leaks, unusual sounds or error messages.
- Verify irrigation is reaching new plant and turf zones without flooding hardscape.
- Keep drain inlets, skimmers and construction-sensitive areas clear.
- Do not add chemicals, change programming or operate unfamiliar valves without direction.
First week
- Continue the prescribed pool-startup routine.
- Confirm automation schedules and owner access.
- Observe water level, drainage after rain and new-landscape moisture.
- Photograph any concern before altering it.
- Review punch-list progress and report time-sensitive issues promptly.
Weeks two through four
- Transition irrigation only as plants and sod establish and weather permits.
- Confirm the ongoing pool-service arrangement.
- Verify product registrations and retain receipts or installation records.
- Inspect finish transitions, joints, drains, landscape settlement and lighting aim.
- Move recurring maintenance items from the construction list into the ownership schedule.
What is normal observation versus urgent reporting?
Minor landscape adjustment, water-balancing changes and expected material variation may be part of establishment. Active leaks, electrical faults, unsafe conditions, unexpected structural movement, repeated equipment alarms, rapidly falling water level or severe erosion should be reported immediately to the appropriate professional.
One-month review
Use a single review list organized by system—not scattered texts and photos. Record the issue, location, date, image and whether it belongs to construction completion, maintenance, product warranty or owner care.